Logistics Center
“Tessi” OOD's logistics center to existing production building
Client:
IRKON OOD
Location:
Town of Shumen
Performed activities:
- Construction of a firewall between the new Logistics Center, the Administrative-residential area and the existing Production building made of white mineral wool vertical panels (micro-profiled) with a thickness of 10cm.
- Installation of white mineral wool vertical panels (micro-profiled) with a thickness of 10cm. on the facades at the storage area using the method of hidden installation.
- Installation of white facade cassettes, with a thickness of 15cm, on facades at the loading and unloading area.
- Installation of mineral wool, with a thickness of 15cm (40 kg / m³), into facade cassettes at the loading and unloading area.
- Laying of a vapor permeable anti-condensation membrane (120-140g/m²) on facade cassettes at the loading and unloading area.
- Installation of dark gray facade corrugated sheet metal on facade cassettes at the loading and unloading area.
- Installation of white mineral wool panels (micro-profiled) to form openings around the sectional doors and the rubber sleeves.
- Installation of horizontal equipment kits:
- 0.5mm sheet with polyester coating; - Installation of vertical equipment kits:
- 0.5mm sheet with polyester coating; - Installation of emergency barrels of 45/15cm along the edges at the loading and unloading area.
- Installation of white mineral wool vertical panels (micro-profiled) with a thickness of 10cm. along the edges (inside) at the loading and unloading area to hide the metal structure.