News

Strimona Stroy carries out the metal construction works on the following site: "Nikopol Depot"

Together with Balkan Steel Engineering, Strimona Stroy performs the metal structure works upon the following project: "Establishment of a regional waste management system in the area of Levski, the municipality of Nikopol" The gross floor area of the facilities on this site is 8432 square meters, which will be constructed with 560 tons of steel structures.
The project aims to build the necessary infrastructure for environmentally friendly disposal of the municipal solid waste generated in the region of Levski (Nikopol).
Целта на проекта е изграждането на необходимата инфраструктура за екологосъобразното обезвреждане на цялото количество битови отпадъци, които ще се генерират на територията на регион Левски(Никопол).