News

10 bus stops for express bus routes and a system of bicycle lanes in Burgas

11.05.2016

Strimona Stroy has once again delivered a good performance in implementation of the following site: "Preparation of technical investment projects for building express bus routes and a system of bicycle lanes" in Burgas.
Subsite: "Intermediate stops along the express bus routes."
The project includes a total of 10 bus stops. Stops are located in a manner that avoids conflict when stopping, passengers getting down, manoeuvring, waiting and departure. The project provides accessibility of the built environment for disabled people through reinforced concrete ramps with a heating system. Strimona Stroy performed manufacturing, delivery and installation of the steel structure.
The client is: Balkan Steel Engineering OOD

The assembly works at the following site started out: "Construction of a Flower Market Place" - REGULATED LAND PLOT (RLP) V, district 233, according to the plan of the town of Sofia, area of Momkova Mahala, region of Nadezhda.

13.04.2016

The structure on this site is made wholly of steel. Cold-formed pipes with square and rectangular section in appropriate sizes were used. All connections between the individual elements are intended to be made through manual arc-welding. The floor structure is made of trapezoid sheet metal on which a solid concrete slab will be constructed. Thermal panels will be used for the walls. The weight of the metal structure is 130 t. Strimona Stroy is responsible for the manufacturing, delivery and installation of the steel structure, anchor devices and LT sheet metal.
Client: Infra Rouds EOOD